Engineering Insurance provides economic safeguard to the risks encountered by the ongoing construction projects, installation projects, machines and equipment used in them . The nature of project decides which policy would be suitable.
Introduction
Who can take this Policy?
Coverage
Add on Covers
Basis of Sum lnsured
Exclusions
IMPORTANT POINTS TO REMEMBER WHILE BUYING THE POLICY
Key Documents at The Time Of Claims
General Claim Intimation
Format
Immediate Action Client
Should Take
Indicative General Documents
for Settlement of Claims
General Claim Intimation Format
Date of Loss
Description of Loss
Contact person Details
Approx Loss
Policy Number
Loss Location
Approx. period for interruption
Immediate Action Client Should Take
Immediately Inform the Insurer
Take all necessary steps to reduce the loss
Focus to save the critical activities/ machinery
Indicative General Documents for Settlement of Claims
Project report showing the expected commencement of the project
Calculation on arriving at Gross Profit
Calculation showing the total loss during the Indemnity Period
Why Choose Us?
Professional & Experienced Team
Customized Solutions
Strong Relationship With Insurance Companies
Service Commitment ONTIME EVERYTIME
Technological Edge
Additional Services Offered
Competitive Premium
Single Window Solution
Downloads
Proposal Form
Proprosal Form
Policy Wordings
Policy Wordings
Claim Form
Claim Form
FAQ's
PREMIUM
COVERAGES
CLAIMS
OTHERS
Claim Case Study - 1
1
Situation
A company which is into the Business of ropeway installation has taken a Erection policy. The plant and machinery whose value was in few crores and was used only for installation was covered under the project cost and not under plant and machinery.
2
Challenge
The ropeway used for installation broke down and the erection work stoped. Surveyor raised the concern that the plant and machinery of such high value cannot be covered under the EAR policy.
3
Solution
Exact details should be shared with the Insurer at the time of taking the policy, so that covers can be suggested accordingly.
4
Advisory/Conclusion
Plant and machinery of more than 25 Lacs should be covered under as separate policy.